BasinWise — Dependency & Reliability Intelligencerelease v1 · genome v1 · run run_water_rights_v133 signals92,201 instances
Overview / Signals / Water-secured development parcel / siginst_ep_wr_20260718_water-secured-development-parcel_0672

Water-secured development parcel

candidateST VRAIN PUMP STATION 2

36.62370091 ac res vacant parcel (WELD County, assessed $5k, p7 $/ac for its class) served by ST VRAIN PUMP STATION 2 — water quality 0.79, physical service only — entitlement unverified. Water-secured development-ready ground.

Priority
35.8
composite 0–100
Raw score
72.4
detector output 0–100
Confidence
0.75
0–1
Observed
2026-07-18
12:00:00
Priority componentsweights: impact .30 · urgency .25 · confidence .20 · freshness .15 · novelty .10
impact0.00
urgency0.60
confidence0.30
freshness0.55
novelty0.65
Record payloadcustomer_payload — everything the detector carried
wdid
0500918
state
CO
county
WELD
acreage
36.62370091
latitude
40.164819
longitude
-105.006328
parcel_id
08123-131304400059
county_fips
08123
identifiers
{"wdid":"0500918","parcel_id":"08123-131304400059"}
parcel_owner
OLIVER KATHARINE H (LE)
situs_address
null
assessed_value
4960
land_use_class
res_vacant
staleness_note
assessor roll from annual OIT data call; ownership may be up to 12 months stale
structure_name
ST VRAIN PUMP STATION 2
assessor_vintage
2026-01-01
score_components
{"posture":"vacant","conveyance":null,"link_sub_type":"headgate_on_parcel","water_quality":0.79,"link_confidence":0.800000011920929,"value_percentile":0.07,"entitlement_status":"none","reliability_median":1}
Provenance receiptexactly where this detection came from
instance id
siginst_ep_wr_20260718_water-secured-development-parcel_0672
record
08123-131304400059 @ water_parcels
signal
signal:water-secured-development-parcel
definition
v1
genome
v1 · run run_water_rights_v1
epoch
ep_wr_20260718
lineage status
resolved
detected
2026-07-18 12:00:00
valid from
2026-07-18 12:00:00
source refs
["cdss-structures","cdss-netamounts","cdss-admin-calls","cdss-divrec","co-oit-parcels","nrcs-snotel","openet","water-court-outcomes","ditch-ledger-program"]
Co-firing signalsother detections on this record
PriSignalDetailScore
73Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.85.0
70Critical call exposureST VRAIN PUMP STATION 2 (1986 priority) carries 1,053.5 day-equivalents of observed call exposure from 50 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 855 season-days curtailed in the last five seasons.55.8
66Critical call exposureST VRAIN PUMP STATION 2 (1904 priority) carries 1,014.2 day-equivalents of observed call exposure from 44 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 834 season-days curtailed in the last five seasons.55.2
66Critical call exposureST VRAIN PUMP STATION 2 (1902 priority) carries 997.3 day-equivalents of observed call exposure from 42 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 813 season-days curtailed in the last five seasons.55.0
66Critical call exposureST VRAIN PUMP STATION 2 (1902 priority) carries 988.5 day-equivalents of observed call exposure from 41 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 808 season-days curtailed in the last five seasons.54.8
66Critical call exposureST VRAIN PUMP STATION 2 (1871 priority) carries 602.9 day-equivalents of observed call exposure from 14 senior caller(s); dominant caller JAMES DITCH (118.3 day-eq). 508 season-days curtailed in the last five seasons.49.0
66Critical call exposureST VRAIN PUMP STATION 2 (1929 priority) carries 1,046.6 day-equivalents of observed call exposure from 49 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 846 season-days curtailed in the last five seasons.55.7
61Season call nowcast: expected curtailmentST VRAIN PUMP STATION 2, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~199 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
60Drought reliability cliffST VRAIN PUMP STATION 2: modeled irrigation-season reliability 81% in median years → 29% dry → 7% severe drought (2002-class replay). A 74-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PUMP STATION 2: modeled irrigation-season reliability 81% in median years → 29% dry → 7% severe drought (2002-class replay). A 74-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PUMP STATION 2: modeled irrigation-season reliability 82% in median years → 36% dry → 10% severe drought (2002-class replay). A 72-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PUMP STATION 2: modeled irrigation-season reliability 82% in median years → 35% dry → 9% severe drought (2002-class replay). A 73-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PUMP STATION 2: modeled irrigation-season reliability 82% in median years → 33% dry → 9% severe drought (2002-class replay). A 73-point cliff under stress.100.0
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PUMP STATION 2: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
43Decree-to-current-use conflict36.62370091 ac res vacant parcel is served by ST VRAIN PUMP STATION 2, whose decree permits only [12345678AP]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.62.5