BasinWise — Dependency & Reliability Intelligencerelease v1 · genome v1 · run run_water_rights_v133 signals92,201 instances
Overview / Signals / Underused water asset / siginst_ep_wr_20260718_underused-water-asset_20482

Underused water asset

verifiedST VRAIN PALMERTON DITCH

124.7804 ac (BOULDER County, DUNN CLIFF): mapped irrigation ended 2020 — 6 years idle — while senior physical service on ST VRAIN PALMERTON DITCH still attaches. Idle water on idle ground.

Priority
51.2
composite 0–100
Raw score
77.8
detector output 0–100
Confidence
0.78
0–1
Observed
2020-12-31
00:00:00
Priority componentsweights: impact .30 · urgency .25 · confidence .20 · freshness .15 · novelty .10
impact0.31
urgency0.50
confidence0.78
freshness0.45
novelty0.70
Record payloadcustomer_payload — everything the detector carried
wdid
0500528
state
CO
county
BOULDER
acreage
124.7804
latitude
40.193528
longitude
-105.179698
parcel_id
08013-120325000066
county_fips
08013
identifiers
{"wdid":"0500528","parcel_id":"08013-120325000066"}
parcel_owner
DUNN CLIFF
situs_address
12185 N 75TH ST
assessed_value
93259
land_use_class
other
staleness_note
assessor roll from annual OIT data call; ownership may be up to 12 months stale
structure_name
ST VRAIN PALMERTON DITCH
assessor_vintage
2026-01-01
score_components
{"idle_years":6,"water_quality":0.79,"last_irrigated":2020,"entitlement_status":"none"}
Provenance receiptexactly where this detection came from
instance id
siginst_ep_wr_20260718_underused-water-asset_20482
record
08013-120325000066 @ water_parcels
signal
signal:underused-water-asset
definition
v1
genome
v1 · run run_water_rights_v1
epoch
ep_wr_20260718
lineage status
resolved
detected
2026-07-18 12:00:00
valid from
2020-12-31 00:00:00
source refs
["cdss-structures","cdss-netamounts","cdss-admin-calls","cdss-divrec","co-oit-parcels","nrcs-snotel","openet","water-court-outcomes","ditch-ledger-program"]
Co-firing signalsother detections on this record
PriSignalDetailScore
88Critical caller value-at-riskST VRAIN PALMERTON DITCH's observed call reaches 1697 parcels — 22,845 coverage-weighted acres, $204.3M assessed value, 1047 distinct owners — through the 28 structures it has put out of priority (52,614.5 day-equivalents, most recently 2026).100.0
85Critical call exposureST VRAIN PALMERTON DITCH (1874 priority) carries 732.1 day-equivalents of observed call exposure from 18 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 607 season-days curtailed in the last five seasons.51.0
80Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~155 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.97.6
80Critical call exposureST VRAIN PALMERTON DITCH (1929 priority) carries 982.5 day-equivalents of observed call exposure from 48 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 797 season-days curtailed in the last five seasons.54.7
80Critical call exposureST VRAIN PALMERTON DITCH (1911 priority) carries 973.9 day-equivalents of observed call exposure from 45 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 790 season-days curtailed in the last five seasons.54.6
76Critical call exposureST VRAIN PALMERTON DITCH (1889 priority) carries 910.6 day-equivalents of observed call exposure from 32 senior caller(s); dominant caller HIGHLAND DITCH (154.9 day-eq). 752 season-days curtailed in the last five seasons.53.7
75Critical call exposureST VRAIN PALMERTON DITCH (1909 priority) carries 953.8 day-equivalents of observed call exposure from 43 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 785 season-days curtailed in the last five seasons.54.3
75Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 54% dry → 28% severe drought (2002-class replay). A 58-point cliff under stress.87.6
73Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~199 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
73Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~198 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
72Underused water asset866.358 ac (BOULDER County, CEMEX INC): mapped irrigation ended 2020 — 6 years idle — while senior physical service on ST VRAIN PALMERTON DITCH still attaches. Idle water on idle ground.77.8
72Critical call exposureST VRAIN PALMERTON DITCH (1890 priority) carries 912 day-equivalents of observed call exposure from 33 senior caller(s); dominant caller HIGHLAND DITCH (154.9 day-eq). 752 season-days curtailed in the last five seasons.53.7
72Critical call exposureST VRAIN PALMERTON DITCH (1892 priority) carries 918.6 day-equivalents of observed call exposure from 36 senior caller(s); dominant caller HIGHLAND DITCH (154.9 day-eq). 755 season-days curtailed in the last five seasons.53.8
72Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 81% in median years → 29% dry → 7% severe drought (2002-class replay). A 74-point cliff under stress.100.0
72Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 81% in median years → 31% dry → 7% severe drought (2002-class replay). A 74-point cliff under stress.100.0
71Basin chokepoint callerST VRAIN PALMERTON DITCH has put 821 decreed rights (11,418 cfs decreed, 0 distinct owners) out of priority — 52,614.5 day-equivalents of administered curtailment, most recently 2026. Caller Power Index 25.8.25.8
69Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~190 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
68Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 38% dry → 11% severe drought (2002-class replay). A 71-point cliff under stress.100.0
67Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~196 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
66Critical call exposureST VRAIN PALMERTON DITCH (1871 priority) carries 538.8 day-equivalents of observed call exposure from 13 senior caller(s); dominant caller JAMES DITCH (118.3 day-eq). 459 season-days curtailed in the last five seasons.48.1
66Critical call exposureST VRAIN PALMERTON DITCH (1877 priority) carries 732.1 day-equivalents of observed call exposure from 18 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 607 season-days curtailed in the last five seasons.51.0
66Critical call exposureST VRAIN PALMERTON DITCH (1986 priority) carries 989.4 day-equivalents of observed call exposure from 49 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 806 season-days curtailed in the last five seasons.54.8
66Critical call exposureST VRAIN PALMERTON DITCH (1873 priority) carries 696.3 day-equivalents of observed call exposure from 16 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 573 season-days curtailed in the last five seasons.50.4
66Critical call exposureST VRAIN PALMERTON DITCH (1873 priority) carries 696.4 day-equivalents of observed call exposure from 16 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 573 season-days curtailed in the last five seasons.50.4
66Critical call exposureST VRAIN PALMERTON DITCH (1904 priority) carries 950.1 day-equivalents of observed call exposure from 43 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 785 season-days curtailed in the last five seasons.54.3
66Critical call exposureST VRAIN PALMERTON DITCH (1902 priority) carries 933.2 day-equivalents of observed call exposure from 41 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 764 season-days curtailed in the last five seasons.54.0
66Critical call exposureST VRAIN PALMERTON DITCH (1873 priority) carries 693.8 day-equivalents of observed call exposure from 16 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 571 season-days curtailed in the last five seasons.50.4
66Critical call exposureST VRAIN PALMERTON DITCH (1902 priority) carries 924.4 day-equivalents of observed call exposure from 40 senior caller(s); dominant caller HIGHLAND DITCH (156.8 day-eq). 759 season-days curtailed in the last five seasons.53.9
66Critical call exposureST VRAIN PALMERTON DITCH (1871 priority) carries 692.1 day-equivalents of observed call exposure from 15 senior caller(s); dominant caller HIGHLAND DITCH (151.2 day-eq). 570 season-days curtailed in the last five seasons.50.4
66Critical call exposureST VRAIN PALMERTON DITCH (1871 priority) carries 498.8 day-equivalents of observed call exposure from 12 senior caller(s); dominant caller JAMES DITCH (118.3 day-eq). 419 season-days curtailed in the last five seasons.47.4
66Critical call exposureST VRAIN PALMERTON DITCH (1870 priority) carries 496.6 day-equivalents of observed call exposure from 12 senior caller(s); dominant caller JAMES DITCH (118.3 day-eq). 417 season-days curtailed in the last five seasons.47.2
66Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 33% dry → 8% severe drought (2002-class replay). A 73-point cliff under stress.100.0
65Critical call exposureST VRAIN PALMERTON DITCH (1869 priority) carries 488.4 day-equivalents of observed call exposure from 12 senior caller(s); dominant caller JAMES DITCH (118.3 day-eq). 408 season-days curtailed in the last five seasons.46.2
64Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~190 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
64Season call nowcast: expected curtailmentST VRAIN PALMERTON DITCH, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~191 of 214 season days from the basin's administration record. Dominant caller HIGHLAND DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
62Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 37% dry → 11% severe drought (2002-class replay). A 72-point cliff under stress.100.0
62Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 38% dry → 11% severe drought (2002-class replay). A 71-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 81% in median years → 29% dry → 7% severe drought (2002-class replay). A 74-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 33% dry → 9% severe drought (2002-class replay). A 73-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 35% dry → 9% severe drought (2002-class replay). A 73-point cliff under stress.100.0
55Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 82% in median years → 36% dry → 10% severe drought (2002-class replay). A 72-point cliff under stress.100.0
53Augmentation condition not verifiedST VRAIN PALMERTON DITCH: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedST VRAIN PALMERTON DITCH: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
51Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 54% dry → 28% severe drought (2002-class replay). A 58-point cliff under stress.87.6
50Underused water asset107.072 ac (BOULDER County, COUNTY OF BOULDER): mapped irrigation ended 2020 — 6 years idle — while senior physical service on ST VRAIN PALMERTON DITCH still attaches. Idle water on idle ground.77.8
50Parcel-split allocation riskIrrigated place D1-2020-10504931 (118 ac, GRASS_PASTURE, served by ST VRAIN PALMERTON DITCH) now spans 4 parcels held by 3 owner(s) — 4 parcel(s) show NO entitlement instrument of their own. The land split; the water paper didn't.100.0
49Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 54% dry → 32% severe drought (2002-class replay). A 54-point cliff under stress.81.2
49Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 54% dry → 32% severe drought (2002-class replay). A 54-point cliff under stress.81.1
49Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 55% dry → 33% severe drought (2002-class replay). A 54-point cliff under stress.80.3
49Drought reliability cliffST VRAIN PALMERTON DITCH: modeled irrigation-season reliability 86% in median years → 54% dry → 33% severe drought (2002-class replay). A 54-point cliff under stress.80.3