BasinWise — Dependency & Reliability Intelligencerelease v1 · genome v1 · run run_water_rights_v133 signals92,201 instances
Overview / Signals / Underused water asset / siginst_ep_wr_20260718_underused-water-asset_3975

Underused water asset

verifiedHIGHLINE CNL

null ac (ARAPAHOE County, KENT-DENVER COUNTRY DAY SCHOOL): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.

Priority
41.9
composite 0–100
Raw score
77.8
detector output 0–100
Confidence
0.78
0–1
Observed
2020-12-31
00:00:00
Priority componentsweights: impact .30 · urgency .25 · confidence .20 · freshness .15 · novelty .10
impact0.00
urgency0.50
confidence0.78
freshness0.45
novelty0.70
Record payloadcustomer_payload — everything the detector carried
wdid
0801004
state
CO
county
ARAPAHOE
acreage
null
latitude
39.629771
longitude
-104.934867
parcel_id
08005-2075-07-3-00-001
county_fips
08005
identifiers
{"wdid":"0801004","parcel_id":"08005-2075-07-3-00-001"}
parcel_owner
KENT-DENVER COUNTRY DAY SCHOOL
situs_address
4000 E QUINCY AVE
assessed_value
null
land_use_class
residential
staleness_note
assessor roll from annual OIT data call; ownership may be up to 12 months stale
structure_name
HIGHLINE CNL
assessor_vintage
2026-01-01
score_components
{"idle_years":6,"water_quality":0.79,"last_irrigated":2020,"entitlement_status":"none"}
Provenance receiptexactly where this detection came from
instance id
siginst_ep_wr_20260718_underused-water-asset_3975
record
08005-2075-07-3-00-001 @ water_parcels
signal
signal:underused-water-asset
definition
v1
genome
v1 · run run_water_rights_v1
epoch
ep_wr_20260718
lineage status
resolved
detected
2026-07-18 12:00:00
valid from
2020-12-31 00:00:00
source refs
["cdss-structures","cdss-netamounts","cdss-admin-calls","cdss-divrec","co-oit-parcels","nrcs-snotel","openet","water-court-outcomes","ditch-ledger-program"]
Co-firing signalsother detections on this record
PriSignalDetailScore
95Critical call exposureHIGHLINE CNL (1879 priority) carries 559.2 day-equivalents of observed call exposure from 23 senior caller(s); dominant caller EVANS NO 2 DITCH (212.4 day-eq). 465 season-days curtailed in the last five seasons.48.4
85Season call nowcast: expected curtailmentHIGHLINE CNL, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~92 of 214 season days from the basin's administration record. Dominant caller EVANS NO 2 DITCH: P(call by Jun 15) = 1 over 6 comparable seasons.77.4
73Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.95.1
73Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.95.1
73Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.95.1
73Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.95.1
72Critical call exposureHIGHLINE CNL (1893 priority) carries 2,389.7 day-equivalents of observed call exposure from 59 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 1941 season-days curtailed in the last five seasons.75.9
66Critical call exposureHIGHLINE CNL (1990 priority) carries 3,293.8 day-equivalents of observed call exposure from 86 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 2630 season-days curtailed in the last five seasons.89.4
66Critical call exposureHIGHLINE CNL (1899 priority) carries 2,314.3 day-equivalents of observed call exposure from 53 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 1879 season-days curtailed in the last five seasons.74.7
66Critical call exposureHIGHLINE CNL (1921 priority) carries 2,957 day-equivalents of observed call exposure from 75 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 2378 season-days curtailed in the last five seasons.84.4
66Critical call exposureHIGHLINE CNL (1964 priority) carries 3,191.3 day-equivalents of observed call exposure from 83 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 2575 season-days curtailed in the last five seasons.87.9
66Critical call exposureHIGHLINE CNL (1985 priority) carries 3,267 day-equivalents of observed call exposure from 85 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 2616 season-days curtailed in the last five seasons.89.0
66Critical call exposureHIGHLINE CNL (1990 priority) carries 3,293.5 day-equivalents of observed call exposure from 86 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 2630 season-days curtailed in the last five seasons.89.4
66Critical call exposureHIGHLINE CNL (2005 priority) carries 3,998.5 day-equivalents of observed call exposure from 90 senior caller(s); dominant caller SOUTH PLATTE RIVER COMPACT (573.1 day-eq). 3212 season-days curtailed in the last five seasons.100.0
64Season call nowcast: expected curtailmentHIGHLINE CNL, 2026 season outlook: Apr 1 SWE 61% of median → severe-class year; expected curtailment ~181 of 214 season days from the basin's administration record. Dominant caller SOUTH PLATTE RIVER COMPACT: P(call by Jun 15) = 1 over 6 comparable seasons.100.0
56Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.82.0
53Augmentation condition not verifiedHIGHLINE CNL: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
53Augmentation condition not verifiedHIGHLINE CNL: the decree requires augmentation coverage for out-of-priority depletions, but NO plan membership is found. Verify coverage before relying on this supply — absent a plan, curtailment is immediate on the next call.59.5
50Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.74.2
48Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.72.6
47Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.70.9
47Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.70.3
47Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.70.1
47Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.69.9
46Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.69.6
46Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.69.0
44Parcel-split allocation riskIrrigated place D1-2020-10800897 (22 ac, ALFALFA, served by HIGHLINE CNL) now spans 2 parcels held by 2 owner(s) — 2 parcel(s) show NO entitlement instrument of their own. The land split; the water paper didn't.88.4
44Parcel-split allocation riskIrrigated place D1-2020-10814448 (21 ac, ALFALFA, served by HIGHLINE CNL) now spans 2 parcels held by 2 owner(s) — 2 parcel(s) show NO entitlement instrument of their own. The land split; the water paper didn't.88.4
43Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.65.1
43Decree-to-current-use conflictnull ac residential parcel is served by HIGHLINE CNL, whose decree permits only [1234589QW]. Development use conflicts with the irrigation decree — a change case is likely required before water follows the project.65.1
43Basin chokepoint callerHIGHLINE CNL has put 2382 decreed rights (60,955 cfs decreed, 0 distinct owners) out of priority — 672.7 day-equivalents of administered curtailment, most recently 2010. Caller Power Index 39.7.39.7
42Underused water assetnull ac (ARAPAHOE County, HOLLIS CATHERINE P): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, GREER MARTIN, LEIGH SHARI G): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, HAITH MICHAEL, HAGERMAN MALINDA): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, LITTLETON CEMETERY ASSN): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, CHERRY HILLS VILLAGE CITY OF): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, LITTLETON CEMETERY ASSN): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, ARAPAHOE COMMUNITY COLLEGE): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, KENT-DENVER COUNTRY DAY SCHOOL): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, CLEARVIEW FARM LLC): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, CARSON STANLEY D, CARSON BONITA S): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, FUTCHER 2000 FAMILY TRUST): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, BERRY BROCK, CARLSON SHELBY): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, ROTOLE JACKIE L): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, LITTLE PRINCE LLC): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, VAN EYK SCOTT A): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, CLEARVIEW FARM LLC): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8
42Underused water assetnull ac (ARAPAHOE County, REGIONAL TRANSPORTATION DISTRICT): mapped irrigation ended 2020 — 6 years idle — while senior physical service on HIGHLINE CNL still attaches. Idle water on idle ground.77.8